I keep going on and on about all the projects I'm planning for around the house, so for those who might be interested, here's the deal:

Several items exist in cascading sequences with each task depending on the completion of the preceding one. Some of these cascades are also interleaved.

Cascade #1 -- the Living Room
- Move entire contents of living room into spare bedroom (once it's again spare), except for couch and love seat which go to the dump.
- Rip up carpeting and remove warped subflooring. Possibly also remove existing tile which gets tricky because of the woodburning stove.
- Possibly replace sliding glass door with one that is properly installed and more secure.
- Replace warped subflooring. Either extend existing tiled area or re-tile covering larger area. (It's occurred to me that I'm unlikely to be able to match the tile, and it might work better just to redo the entire thing.) Install wood flooring (probably the veneer type, since people have been warning me off the plastic-finish laminate type).
- Possibly, in the middle of the above, repaint the living room, since if I'm going to do it any time in the near future, it would be easiest when the floor is bare.
- Install the wall full of cabinets that will be the entertainment/sewing center. Move contents into them (out of the spare bedroom).
- Install a wall full of bookcases. (This is a pre-requisite for part of Cascade #2.) Move the textile and costume books downstairs, plus certain other categories.
- Purchase a sofa-bed and redeem my recliner coupon. Also acquire a work table that folds down out of the way (I have my eye on a particular model). Arrange living room.
- Figure out what I want to do long-term about a computer workstation.

Cascade #2 -- The Office

- Resurface roof.
- Repair ceiling leak areas (including some in other apartment).
- (optional) Install ceiling fan/light fixture above stairwell.
- Move desk out of corner (intended location not yet determined).
- Move drafting table and art supplies cabinet out of kitchen nook and into office corner. Also remove cookbooks and book shelves from kitchen nook and reserve for later.
- Carefully saw off approx. ½ inch from bottom of two of the stacking tool cabinets. Move cabinets into kitchen nook and stack.
- Move filing cabinets out of office. (intended location not yet determined but will also involve triage on contents)
- Move approximately half the books from the office down into the new bookcases in the living room. Rearrange books. Triage books. Remove freestanding bookshelves from office (destination unknown) and remove wall-mounted bookshelves leaving only the whole-wall built-in set of shelves.
- Buy dining room table, chairs, and display dresser. Office now becomes dining room. Move nice china, etc. etc. into display dresser.

Unrelated projects
- Fix wall behind stove in downstairs apartment. (Tile?) Install vent hood.
- Paint downstairs apartment.
- Fix small broken tile in upstairs apartment (very minor project).
- Survey exterior for repairs and fix. Re-paint exterior.
- Finish installing concrete blocks in driveway tire-paths.
- Install exterior floodlights with motion sensor.

Projects unlikely to be done this season
- Install half-bath under stairs.
- Relax and enjoy my free time.

This account has disabled anonymous posting.
(will be screened if not on Access List)
(will be screened if not on Access List)
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

Profile

hrj: (Default)
hrj

January 2026

S M T W T F S
    123
456 7 8910
11121314151617
18192021222324
25262728293031

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 10th, 2026 07:30 pm
Powered by Dreamwidth Studios