hrj: (Default)
[personal profile] hrj
The door is in stock. The contractor is eager. This should be finished before I take off for my Thanksgiving trip. Now to get back to the flooring people and line them up to come in and actually lay the floor. And get a chimney sweep in to ream out the stove-pipe, as long as I have the stove detached. Is it hubris to think, "Gee, maybe I could slap some new paint on the walls before they get the floor in?" There would never be a better time, but the schedule's already pretty crowded. (On the other hand, you can save a lot of time when you're allowed to be sloppy.) My gut instinct tells me that repainting is "the project that does not need to be done right now". Because I still have to clean and re-black the stove before it goes back in. To say nothing of lining up a few gorillas to help me move things when the time comes. Ok, back to nail-biting.

Date: 2006-11-13 07:56 pm (UTC)
From: [identity profile] msmemory.livejournal.com
I'm not sure I'd repaint til after the chimney sweep has finished.

Profile

hrj: (Default)
hrj

February 2026

S M T W T F S
12 3 4567
8 91011 1213 14
1516171819 2021
2223242526 2728

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 1st, 2026 05:32 am
Powered by Dreamwidth Studios